Traffic junction Siekierkowska roadway, Poland

Traffic junction Siekierkowska roadway, Warsaw, Poland - For the superstructure formwork as well as the shoring construction consisting of the MULTIPROP system and ST 100 stacking towers, only system components were used.
Traffic junction Siekierkowska roadway, Warsaw, Poland - In the eastern part of the city centre, the Siekierkowska route connects to the southern ring road on three levels and with no intersections using two bridge constructions.
Traffic junction Siekierkowska roadway, Warsaw, Poland - The raised formwork units could be anchored to the bridge superstructure. Thus, the shoring construction was able to be dismantled section by section for the next cycle.

Info projecten

Ligging: Warsaw, Polen

Access roads with lengths of 723 m and 419 m for the intersection-free routing of the Siekierkowska roadway on the southern ring road at the traffic junction Bora Komorowskiego over 3 levels.

Vereisten

  • fabrication of the pillars, the bulkheads and the bridge superstructure
  • 6 pouring sections with a length of about 50 m each, simultaneously

Klant

Budimex-Dromex S.A., Warsaw

Voordeel klant

  • fast moving of formwork and shoring
  • fast construction progress
Siekierkowska junction - Wlodzimierz Bielski, Site Manager
Wlodzimierz Bielski

We were able to anchor the PERI formwork units at the bridge during striking to be able to dismantle the shoring. This helped us to save very much time and a lot of labour costs. Because especially on inner-city jobsites, fast moving of the formwork is of particular importance.

PERI oplossing

  • formwork units based on rentable standard parts for the shuttering of the box girder cross-section
  • fastening at the bridge structure with DW 15 ties for fast moving of the shoring